Reexamination counseling
The Reexamination Stay Paradox: When Waiting for the USPTO Helps the Wrong Party
Consider a hypothetical supplier that obtains the litigation stay it requested. Its legal spending falls, but customers awaiting a noninfringement ruling defer long-term orders. The patent owner also spends less, relieving the financial pressure that had made settlement attractive. The supplier has won its motion while potentially worsening its negotiating position.
Ex parte reexamination makes that result possible because the USPTO and the court answer different questions. The Office may cancel claims, confirm them, or incorporate permissible amended or new claims. It does not decide whether the supplier’s product infringes. A pause can therefore conserve judicial resources without producing the answer the movant’s business needs. [1]
Counsel should make two recommendations separately: whether the record supports a stay and whether the company should want one. The second depends on what continued uncertainty costs, what accused conduct continues, and which business opportunity may disappear before proceedings resume. Both parties can benefit from a pause. The opponent’s savings alone do not establish that the movant loses; the comparison is with the movant’s available litigation alternatives.
An order changes the stay record
District courts have inherent authority to stay litigation pending reexamination. They commonly examine whether a stay will simplify issues, the stage of discovery and trial preparation, and undue prejudice or tactical disadvantage to the nonmovant. The inquiry is discretionary. Murata Machinery v. Daifuku, an IPR case, confirms that courts may also consider the burden of litigation and circumstances beyond the familiar three factors. [2]
Those factors require a particularized comparison. Identify which asserted claims are being reexamined, what issues will remain regardless of the outcome, and which court expenditures an intervening Office decision might avoid. Claim construction briefing, completed discovery, and a trial date matter because they reveal the work remaining and the consequences of postponing it.
The source of authority also matters. Procter & Gamble v. Kraft Foods addressed former inter partes reexamination, including former § 318. Its discussion of that statutory provision does not create an ex parte entitlement. Likewise, the special statutory stay framework for the former covered business method review program should not be imported wholesale into chapter 30. [3]
In BuzzBallz v. The Beverage Ranch, the Western District of Texas denied a stay without prejudice on April 21, 2025. Neither reexamination request had been filed when the defendant moved. By the hearing, one had been filed and one remained outstanding. Competition weighed slightly against a stay; litigation stage weighed slightly in its favor. Simplification remained speculative. The court permitted renewal after the PTO decided the requests. [4]
Hi-Dow IPHC v. TruePulse presented a different record. On October 17, 2025, the Southern District of Texas granted a stay after both asserted patents entered reexamination. Discovery remained incomplete, no trial date existed, and claim construction had not been heard. Although the parties competed, the court found prejudice neutral on the record presented. The operative complaint did not seek an injunction, and an amendment motion was not yet ripe. The court rejected ordinary collection delay as sufficient prejudice, declined a bond on the support offered, and allowed amendment briefing that could prompt reconsideration. [5]
These decisions illustrate changes in the evidentiary showing, rather than an automatic transition from denial before an order to a stay afterward. In TPK Touch Solutions v. Wintek, the court denied a stay despite an ex parte reexamination order and an early litigation stage, emphasizing limited simplification, competitive harm, possible appeals, and the absence of automatic requester estoppel from ex parte reexamination. Estoppel from an earlier IPR is a separate question. [6]
Nor is an order an absolute prerequisite. In ASCII v. STD Entertainment, the patent owner obtained a conditional stay before filing its proposed application for reexamination or reissue. The court required filing within 30 days and status reports every 60 days. The decision supplies a historical counterexample, not a promise that an unfiled challenge will support relief today. [7]
Separate the administrative timetable from the useful court decision
Section 303(a)’s three-month period concerns the initial substantial-new-question determination. It does not promise a certificate within three months. After the statutory statement-and-reply periods, examination proceeds with special dispatch. The patent owner can appeal an adverse determination, and § 307 provides for a certificate after the appeal period expires or appeal proceedings terminate. [8]
The court has its own sequence of discovery, claim construction, dispositive motions, trial, and appeals. A business may need an answer before a production commitment, financing event, or product launch. A stay application should identify the administrative event expected to affect the litigation and the business deadline by which that development remains valuable.
Finality adds another timing consequence. Fresenius v. Baxter applied reexamination cancellation to infringement litigation that remained pending after remand, while distinguishing a truly final damages judgment. A verdict or earlier appellate ruling does not invariably end that exposure to cancellation. Counsel must identify what judicial work remains, rather than assume either that trial guarantees recovery or that cancellation automatically reopens completed judgments. [9]
Assess damages and claim changes separately
A litigation stay does not license continued accused sales. If a valid, unchanged claim ultimately supports liability, continued infringing conduct may increase recoverable damages. Section 284 provides for compensation and interest; notice, marking, and other limitations still matter. Deferring payment and reducing liability are different economic results. [10]
But accused sales may continue without a stay, too. Counsel should identify the exposure that postponing an available ruling or remedy actually changes. Counting every sale during the pause as harm caused by the stay exaggerates the cost. Conversely, treating postponed litigation as a reduction in ultimate liability exaggerates the benefit.
Claim changes require a separate calculation. Substantively changed claims generally do not support damages for pre-certificate activity. Sections 307(b) and 252 also supply absolute intervening rights for qualifying specific things and permit equitable protection for continued activity or substantial preparations. A textual amendment does not necessarily change substantive scope, and an unchanged original claim does not acquire intervening rights merely through reexamination argument. [11]
An owner can preserve original claims while adding supported narrower claims. Such additions cannot enlarge the scope of an original claim or introduce new matter, but may improve prospective enforcement within those limits. Adding a narrower claim can supply a more specific enforcement theory while an unchanged original claim preserves whatever historical remedies remain available. The challenger should assess remaining original claims and any new claims separately. Equitable intervening rights may protect continued activity, but John Bean v. Morris makes clear that the equities require assessment; investment recoupment alone does not settle the issue. [12]
These consequences can make delay costly for a requester that continues investing in the accused product. They can also favor a requester if cancellation or a substantive change removes the exposure that justified the lawsuit. Neither confirmation nor amendment supplies a universal commercial answer.
Two similar reexaminations can justify opposite strategies
Consider two fictional sensor suppliers. Each promptly seeks reexamination of every asserted claim of two unexpired patents. In each case the USPTO orders reexamination, fact discovery is limited, claim construction briefing is complete, and trial is unset. Neither court has addressed infringement. For this comparison, assume comparable administrative prospects for confirmation, cancellation, or claim changes. The following nine-month business windows are hypothetical assumptions, not USPTO pendency estimates.
The first supplier will retire the accused model after fulfilling existing orders over nine months. Its replacement has undergone a separate design-around analysis. No customer needs a near-term court ruling before purchasing, and the owner principally seeks compensation for legacy sales. Expensive expert discovery and trial preparation lie ahead.
Here, a stay can preserve cash while the supplier completes a finite transition. It may avoid work directed to claims later canceled or substantively amended. If original claims survive, the supplier must still defend the historical case, but its remaining accused sales are limited. The supplier should preserve technical and sales records and plan for the unchanged-claim outcome. A stay fits its commercial timetable even if the Office does not deliver complete cancellation.
The second supplier is entering long production programs. Customers will select components in nine months. Assume no dispositive Office development arrives by then, while a focused infringement record could be ready for a court ruling before selection. The ruling’s timing and outcome remain uncertain. Customers want an infringement answer, and the supplier has a potentially discrete noninfringement defense suitable for focused judicial development. Continued uncertainty delays adoption, while ongoing accused sales add exposure if an original claim survives.
The owner is also funding the litigation from operating cash. Lower litigation expense during a stay allows it to hold out longer in settlement. The supplier’s request to conserve fees may therefore relieve its opponent’s most pressing constraint while suspending the judicial route most relevant to customer commitments. Added, supported claims could create further prospective issues when litigation resumes, subject to scope limits and intervening rights.
On these assumptions, the second supplier should consider continuing the discrete infringement issue or seeking a shorter pause with a reconsideration date. It must compare the cost and likelihood of timely focused litigation with the customer decision it might enable. A negotiated license, contractual risk allocation, or validated design-around could also address customer concerns; the comparison should include those alternatives. A broad stay may still be justified legally; the company’s interests may support opposing it or narrowing its request.
The decisive questions are whether a useful administrative result can arrive before the commercial decision and whether postponing an available court answer helps the party requesting relief. The same analysis applies when an owner seeks a stay to reduce its own expenses. An approaching expiration date can consume the remaining opportunity for prospective relief even if historical damages remain available. Delaying an injunction can also let a competitor establish customer relationships that later monetary relief may not adequately repair.
Hypothetical illustration using this article’s own figures
Retiring model
Consider two fictional sensor suppliers. Each promptly seeks reexamination of every asserted claim of two unexpired patents. In each case the USPTO orders reexamination, fact discovery is limited, claim construction briefing is complete, and trial is unset. Neither court has addressed infringement. For this comparison, assume comparable administrative prospects for confirmation, cancellation, or claim changes. The following nine-month business windows are hypothetical assumptions, not USPTO pendency estimates.
The first supplier will retire the accused model after fulfilling existing orders over nine months. Its replacement has undergone a separate design-around analysis. No customer needs a near-term court ruling before purchasing, and the owner principally seeks compensation for legacy sales. Expensive expert discovery and trial preparation lie ahead.
Here, a stay can preserve cash while the supplier completes a finite transition. It may avoid work directed to claims later canceled or substantively amended. If original claims survive, the supplier must still defend the historical case, but its remaining accused sales are limited. The supplier should preserve technical and sales records and plan for the unchanged-claim outcome. A stay fits its commercial timetable even if the Office does not deliver complete cancellation.
Consequences of waiting
The decisive questions are whether a useful administrative result can arrive before the commercial decision and whether postponing an available court answer helps the party requesting relief. The same analysis applies when an owner seeks a stay to reduce its own expenses. An approaching expiration date can consume the remaining opportunity for prospective relief even if historical damages remain available. Delaying an injunction can also let a competitor establish customer relationships that later monetary relief may not adequately repair.
Details
Retiring model
Consider two fictional sensor suppliers. Each promptly seeks reexamination of every asserted claim of two unexpired patents. In each case the USPTO orders reexamination, fact discovery is limited, claim construction briefing is complete, and trial is unset. Neither court has addressed infringement. For this comparison, assume comparable administrative prospects for confirmation, cancellation, or claim changes. The following nine-month business windows are hypothetical assumptions, not USPTO pendency estimates.
The first supplier will retire the accused model after fulfilling existing orders over nine months. Its replacement has undergone a separate design-around analysis. No customer needs a near-term court ruling before purchasing, and the owner principally seeks compensation for legacy sales. Expensive expert discovery and trial preparation lie ahead.
Here, a stay can preserve cash while the supplier completes a finite transition. It may avoid work directed to claims later canceled or substantively amended. If original claims survive, the supplier must still defend the historical case, but its remaining accused sales are limited. The supplier should preserve technical and sales records and plan for the unchanged-claim outcome. A stay fits its commercial timetable even if the Office does not deliver complete cancellation.
Consequences of waiting
The decisive questions are whether a useful administrative result can arrive before the commercial decision and whether postponing an available court answer helps the party requesting relief. The same analysis applies when an owner seeks a stay to reduce its own expenses. An approaching expiration date can consume the remaining opportunity for prospective relief even if historical damages remain available. Delaying an injunction can also let a competitor establish customer relationships that later monetary relief may not adequately repair.
Long production programs
Consider two fictional sensor suppliers. Each promptly seeks reexamination of every asserted claim of two unexpired patents. In each case the USPTO orders reexamination, fact discovery is limited, claim construction briefing is complete, and trial is unset. Neither court has addressed infringement. For this comparison, assume comparable administrative prospects for confirmation, cancellation, or claim changes. The following nine-month business windows are hypothetical assumptions, not USPTO pendency estimates.
The second supplier is entering long production programs. Customers will select components in nine months. Assume no dispositive Office development arrives by then, while a focused infringement record could be ready for a court ruling before selection. The ruling’s timing and outcome remain uncertain. Customers want an infringement answer, and the supplier has a potentially discrete noninfringement defense suitable for focused judicial development. Continued uncertainty delays adoption, while ongoing accused sales add exposure if an original claim survives.
The owner is also funding the litigation from operating cash. Lower litigation expense during a stay allows it to hold out longer in settlement. The supplier’s request to conserve fees may therefore relieve its opponent’s most pressing constraint while suspending the judicial route most relevant to customer commitments. Added, supported claims could create further prospective issues when litigation resumes, subject to scope limits and intervening rights.
On these assumptions, the second supplier should consider continuing the discrete infringement issue or seeking a shorter pause with a reconsideration date. It must compare the cost and likelihood of timely focused litigation with the customer decision it might enable. A negotiated license, contractual risk allocation, or validated design-around could also address customer concerns; the comparison should include those alternatives. A broad stay may still be justified legally; the company’s interests may support opposing it or narrowing its request.
Consequences of waiting
The decisive questions are whether a useful administrative result can arrive before the commercial decision and whether postponing an available court answer helps the party requesting relief. The same analysis applies when an owner seeks a stay to reduce its own expenses. An approaching expiration date can consume the remaining opportunity for prospective relief even if historical damages remain available. Delaying an injunction can also let a competitor establish customer relationships that later monetary relief may not adequately repair.
Retiring model
Consider two fictional sensor suppliers. Each promptly seeks reexamination of every asserted claim of two unexpired patents. In each case the USPTO orders reexamination, fact discovery is limited, claim construction briefing is complete, and trial is unset. Neither court has addressed infringement. For this comparison, assume comparable administrative prospects for confirmation, cancellation, or claim changes. The following nine-month business windows are hypothetical assumptions, not USPTO pendency estimates.
The first supplier will retire the accused model after fulfilling existing orders over nine months. Its replacement has undergone a separate design-around analysis. No customer needs a near-term court ruling before purchasing, and the owner principally seeks compensation for legacy sales. Expensive expert discovery and trial preparation lie ahead.
Here, a stay can preserve cash while the supplier completes a finite transition. It may avoid work directed to claims later canceled or substantively amended. If original claims survive, the supplier must still defend the historical case, but its remaining accused sales are limited. The supplier should preserve technical and sales records and plan for the unchanged-claim outcome. A stay fits its commercial timetable even if the Office does not deliver complete cancellation.
Consequences of waiting
The decisive questions are whether a useful administrative result can arrive before the commercial decision and whether postponing an available court answer helps the party requesting relief. The same analysis applies when an owner seeks a stay to reduce its own expenses. An approaching expiration date can consume the remaining opportunity for prospective relief even if historical damages remain available. Delaying an injunction can also let a competitor establish customer relationships that later monetary relief may not adequately repair.
Long production programs
Consider two fictional sensor suppliers. Each promptly seeks reexamination of every asserted claim of two unexpired patents. In each case the USPTO orders reexamination, fact discovery is limited, claim construction briefing is complete, and trial is unset. Neither court has addressed infringement. For this comparison, assume comparable administrative prospects for confirmation, cancellation, or claim changes. The following nine-month business windows are hypothetical assumptions, not USPTO pendency estimates.
The second supplier is entering long production programs. Customers will select components in nine months. Assume no dispositive Office development arrives by then, while a focused infringement record could be ready for a court ruling before selection. The ruling’s timing and outcome remain uncertain. Customers want an infringement answer, and the supplier has a potentially discrete noninfringement defense suitable for focused judicial development. Continued uncertainty delays adoption, while ongoing accused sales add exposure if an original claim survives.
The owner is also funding the litigation from operating cash. Lower litigation expense during a stay allows it to hold out longer in settlement. The supplier’s request to conserve fees may therefore relieve its opponent’s most pressing constraint while suspending the judicial route most relevant to customer commitments. Added, supported claims could create further prospective issues when litigation resumes, subject to scope limits and intervening rights.
On these assumptions, the second supplier should consider continuing the discrete infringement issue or seeking a shorter pause with a reconsideration date. It must compare the cost and likelihood of timely focused litigation with the customer decision it might enable. A negotiated license, contractual risk allocation, or validated design-around could also address customer concerns; the comparison should include those alternatives. A broad stay may still be justified legally; the company’s interests may support opposing it or narrowing its request.
Consequences of waiting
The decisive questions are whether a useful administrative result can arrive before the commercial decision and whether postponing an available court answer helps the party requesting relief. The same analysis applies when an owner seeks a stay to reduce its own expenses. An approaching expiration date can consume the remaining opportunity for prospective relief even if historical damages remain available. Delaying an injunction can also let a competitor establish customer relationships that later monetary relief may not adequately repair.
Build the prejudice record around the remedy
Competitive harm requires evidence connecting delay to an injury. Customer commitments, switching barriers, disappearing market opportunities, and remaining patent term can make postponed relief significant. Identify the threatened loss, its expected timing, and why later relief would not repair it. A party seeking damages faces a different record from an owner seeking to prevent continuing displacement. Competition alone does not establish entitlement to an injunction or compel denial of a stay. [4, 5, 13]
The injunction issue cannot simply disappear inside a stay order. In Procter & Gamble, the Federal Circuit vacated a stay that effectively denied preliminary relief without the necessary balancing. Murata likewise vacated an inadequately explained injunction denial while affirming the refusal to lift an IPR stay. The decisions require separate attention to preliminary relief. Procter & Gamble also cautioned that a preliminary injunction and a stay ordinarily should not coexist, given the competing implications of a substantial validity dispute. The Office’s threshold decision to reexamine does not itself resolve the preliminary-injunction merits. Ordinary stay rulings generally are not immediately appealable; the cited cases reached review through injunction-related jurisdiction. [3, 13]
Evidence also has its own calendar. Litigation holds and preservation should continue during a pause. If relevant source code, specimens, or witness testimony may become unavailable, counsel should seek appropriate preservation measures or narrowly justified discovery. Rule 37(e) addresses lost electronically stored information under distinct predicates; delay itself does not establish spoliation. [14]
Ask for a stay that matches the commercial objective
Before moving, distinguish future work likely to be eliminated from work merely postponed. Include the costs of the motion, Office work, ongoing preservation, and restarting litigation. Deferring payment may have financing value even if the same work resumes later, but changing sales, collection risk, and the opponent’s ability to fund continued litigation may offset that advantage. Compare those costs with conditional exposure under unchanged, changed, and canceled claims. Neither sunk fees nor generalized assumptions about reexamination duration answer that inquiry.
The proposed order should identify the covered issues, permitted activity, reporting obligations, and grounds for reconsideration. Specify whether the relevant endpoint is an examiner decision, completed appeal, or certificate. An examiner rejection, an appeal decision, and effective cancellation are different events. Counsel should not assume that an order’s reference to the conclusion of reexamination resolves every timing question. Hi-Dow’s retained amendment motion and ASCII’s reporting requirements illustrate judicial flexibility, not mandatory safeguards. [5, 7]
A limited stay can preserve a useful judicial path, but exceptions also consume resources and can undermine simplification. Bonds, discovery exceptions, and automatic resumption are matters to request and support, not protections either party can assume. Changed circumstances may justify revisiting a stay under Murata, but the court retains discretion. [2, 5]
The recommendation should identify the claim or remedy the company needs to change, the business event it needs to influence, and what happens if the original claims survive. The final question is whether waiting improves the company’s position compared with proceeding in court, after accounting for the decisions postponed, exposure preserved, and commercial opportunities that may expire during the pause. The proposed stay endpoint should track that useful decision, with a supported reconsideration mechanism if the commercial assumptions change.
Authorities and source notes
Authorities checked through November 7, 2026. The district court decisions discussed are the historical orders identified below.
- [1] 35 U.S.C. §§ 305, 307(a); USPTO, MPEP § 2258(I)–(II) (scope of ex parte examination). Sources: Section 305 | Section 307 | MPEP 2258
- [3] Procter & Gamble Co. v. Kraft Foods Global, Inc., 549 F.3d 842, 845–49 (Fed. Cir. 2008); Murata, 830 F.3d at 1361–62; Leahy-Smith America Invents Act, Pub. L. No. 112-29, § 18(b), 125 Stat. 284, 331 (2011) (CBM stay provision). Sources: Procter & Gamble | Murata | AIA section 18
- [4] BuzzBallz, LLC v. The Beverage Ranch, LLC, No. SA-24-CV-00692-JKP, ECF No. 30, at 1–4 (W.D. Tex. Apr. 21, 2025). Sources: Court order
- [5] Hi-Dow IPHC, Inc. v. TruePulse, LLC, No. 3:24-cv-00295, ECF No. 68, at 2–6 (S.D. Tex. Oct. 17, 2025), including at 3 n.3 and 5–6. Sources: Court order
- [6] TPK Touch Solutions, Inc. v. Wintek Electro-Optics Corp., No. 13-cv-02218-JST, ECF No. 39, at 2–7 (N.D. Cal. signed Sept. 16, 2013; filed Sept. 17, 2013); 35 U.S.C. § 315(e) (separate IPR estoppel). Sources: Docket order text | Section 315
- [7] ASCII Corp. v. STD Entertainment USA, Inc., 844 F. Supp. 1378, 1380–81 (N.D. Cal. 1994) (decided Feb. 28, 1994). Sources: Opinion text
- [8] 35 U.S.C. §§ 303(a), 304–307. The three-month period concerns the initial determination under § 303(a), not completion of examination or appeal. Sources: Section 303 | Section 304 | Section 305 | Section 306 | Section 307
- [9] Fresenius USA, Inc. v. Baxter International, Inc., 721 F.3d 1330, 1340–47 (Fed. Cir. 2013). See also Packet Intelligence LLC v. NetScout Systems, Inc., No. 2022-2064, slip op. at 7–16 (Fed. Cir. May 2, 2024) (later application in the IPR context). Sources: Fresenius | Packet Intelligence
- [10] 35 U.S.C. §§ 284, 287(a). Sources: Section 284 | Section 287
- [11] 35 U.S.C. §§ 252, 307(b); Bloom Engineering Co. v. North American Manufacturing Co., 129 F.3d 1247, 1250 (Fed. Cir. 1997); Marine Polymer Technologies, Inc. v. HemCon, Inc., 672 F.3d 1350, 1362–65 (Fed. Cir. 2012) (en banc). Sources: Section 252 | Section 307 | Bloom Engineering | Marine Polymer
- [12] 35 U.S.C. §§ 305, 307; 37 C.F.R. § 1.530(j)–(k); USPTO, MPEP §§ 2250, 2258(II); John Bean Technologies Corp. v. Morris & Associates, Inc., 988 F.3d 1334, 1337–40 (Fed. Cir. 2021), slip op. at 4–10. Sources: Section 305 | Section 307 | Rule and MPEP 2250 | MPEP 2258 | John Bean
- [13] Procter & Gamble, 549 F.3d at 846–49; Murata, 830 F.3d at 1361, 1363–64; eBay Inc. v. MercExchange, L.L.C., 547 U.S. 388, 391–94 (2006). Sources: Procter & Gamble | Murata | eBay
- [14] Fed. R. Civ. P. 37(e) and advisory committee note to the 2015 amendment. Sources: Rule 37